batshonnicole
batshonnicole batshonnicole
  • 02-01-2019
  • Mathematics
contestada

Six people paint the fence and 15 hours how long would it take five workers to do the same job

Respuesta :

somaiasult2006
somaiasult2006 somaiasult2006
  • 02-01-2019
it will take 12.5 hrs for five workers to do the same job.


steps:

15 × 5 = 75

75 ÷ 6 = 12.5
Answer Link

Otras preguntas

What is the purpose of sensory adaptation
I need a Amazon tribe name please! Need for Monday
A bottle rocket that was made in science class had a trajectory path that followed the quadratic equation y=-x^2+4x+6. What is the turning point of the rocket's
How can b^2+9b+14 be re-written?1) (b+7) (b-7)2) (b-7) (b-2)3) (b+7) (b-2)4) (b+7) (b+2)
which inequality is equivalent to 7x-2y> 8. A) y> 7/2x+8 b) y>-2/7x+8/7 c) y <7/2x-4 d) y <-2/7x-4/7 (whats a Inequality? )
A car that travels from point A to point B in four hours, and then from point B back to point A in six hours. The road between point A and point B is perfectly
what are some reasons for limiting authority
What is 68 divided by the square root of 4
after clicking the start button on your computer screen desktop what option would you then select to examine system components you might want to modify?
Jonathan has been on a diet since January 2013. So far, he has been losing weight at a steady rate. Bases on monthly weigh-ins, his weight, w, can be modeled by