StarlightAfton
StarlightAfton StarlightAfton
  • 03-04-2020
  • Mathematics
contestada

I need this answer asap!!!

I need this answer asap class=

Respuesta :

Lola3571
Lola3571 Lola3571
  • 04-04-2020

Answer: The answer is A

Answer Link

Otras preguntas

Kingston Manufacturing has 29,000 labor hours available for producing X and Y. Consider the following information: Product X Product Y Required labor time per u
Please help with this algebra
An ionic compound and a covalent compound are dissolved in separate beakers of H2O. Which solution will conduct an electric current?
The cost c varies directly as the numbers n of pencils is written as A. c = kn B. k+ cn C. n = k/c D. c =k/n
Huey P Long spent large amounts of money for this: A- Textbooks for students B- Poll taxes C- Reducing taxes for the rich D- Radio
Need help in History. There is a picture instead of typing it
The torque required to turn the crank on an ice cream maker is 4.50 Nm. How much work does it take to turn the crank through 300 full turns? A) 4240 J B) 8480 J
Help me please help please
Eddie is a production engineer for a major supplier of component parts for cars. He has determined that a robot can be installed on the production line to repla
R4te me for 10 points and be honest with me PLEASE