A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

4x - (9 - 3x) = 8x - 1
What is 4 4/9 times 2 2/3
use the commutative property to find the unknown numberin the equation 35x70=mx35
a shopper bought a 15 pound bag of oranges for $23.25 what was the unit price
what is 0.0000000345 in scientific notation?
I need to compare math and social studies.
True or False: A flame test can be used to identify the presence of certain elements in a compound?
In his comedies, Shakespeare is well known for A. fatally flawed characters. B. revealing great heroes as common fools. C. an unusual use of Middle English.
What is one half added to three quarters
The Han Dynasty (202 BC – AD 8; AD 25-220) consisted of two parts called the what