jebrinlayan9000 jebrinlayan9000
  • 02-05-2021
  • Mathematics
contestada

Mr. Kumar is getting his house renovated. 1/5 th of the work has been completed in 2 months. How much time will it take for the entire work to be completed?

Respuesta :

liam2747
liam2747 liam2747
  • 02-05-2021

Answer:

10 months

Step-by-step explanation:

If it takes 2 months to do 1/5th, it will take 4 months to do 2/5, 6 months to do 3/5, 8 months to do 4/5, and 10 months to do 5/5 or in other words the whole thing.

Answer Link

Otras preguntas

A direct shear test was performed on a specimen of dry sand. The specimen was 50 mm by 50 mm square and 25 mm thick (height). A normal stress of 192 kPa was app
Based on the passage, the Haida had values that A.were centered around their physical needs. B.encompassed physical and emotional needs. C.were centered around
Simplify the exponential expression.
Who are "uncontacted peoples"? Who are "uncontacted peoples"? A) cultural groups that have yet to be "discovered" by the Western world B) people who do not hav
making a financial transaction based on information not available to other investors is known as
simplify (w^3x^10)^4​
- y + 8x = -2 for x = 0, 1, 2
Angles α and β are the two acute angles in a right triangle, where α = 5x 3 + 20 and β = 2x 3 + 14. Find α. A) 24° B) 30° C) 60° D) 66°
Damian has a spinner. He spun the arrow 60 times and it landed on green 12 times. Based on the data, how many times would the arrow land on green if Damian only
Zebulon Pikes exploration turned out not to be important A) True B) False