In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

in a bag of small balls 1/4 are green, 1/8 are blue, 1/12 are yellow and the remaining 26 white. how many balls are blue?
A child is pushing a shopping cart at a speed of 1.5 m/s how long will it take this child to push the cart down and I'll with the length of 9.3 m
which condition must exist in order for conduction to occur between two substances?
Tommy is beginning a science experiment in the lab the instructions cal for 0.322 kilogram potassium write 0.322 as a fraction
A triangle has a perimeter of 28 cm. If the three sides of the triangle are n, 3n − 4, and 5n − 13, what is the length of each side? Separate multiple entries
how do i write fractions as a sum or difference
4 1/8 tons of gravel is spread evenly across 2 1/6 acres. How many tons of gravel are on each acre?
Determine if g(s) = 4s^2/3 is even, odd, or neither.
Can someone please help me with this asap
in MLA documentation, a writer must_______ all entries in the Works cited list.