carlos907030 carlos907030
  • 01-08-2017
  • Mathematics
contestada

if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

According to the data, which substance had the greatest change in range during the first three years of the chart? Heroin Cocaine Opioid analgesic More inf
Please help need to finish ASAP
Rosses train for half marathon which is 13.1 miles long within four months he has progress to an 11 mile practice run if rustics two months off from training wh
The type of immunoglobulin produced through intranasal vaccination is A. IgA B. IgE C. IgD D. IgM
Using your notes about loyalty in the first act of Julius Caesar, describe the character Brutus as either a betrayer or a patriot.
Explain the differences between barrier and hormonal contraceptives
What was stated in the Dred Scott decision? Slaves should have the right to sue in the courts. Slaves were the property of their owners. Slaves were free when
What is similar to Triangle JKL
QUICK ALGEBRA 2 HELP PLEASE. NEEDED ASAP! 3 Q'S!1) What expression belongs in the box? (look at 1st pic for Q and 3/4 options.)D).-4x-242).(picture 2)3).(some o
A vehicle travels 125.7 feet while its wheels revolve 16 times. find the diameter of the wheels to the nearest inch. d = inches.